Road lighting management(integrated management system construction project)About Road lighting computerized management systemIt is an integrated control system that can computerize all business processes related to road lighting (streetlights, security lights, parks, etc.) that have been managed by hand online and mobile.
ONE STOP integrated implementation
NURI Bill is pursuing the following four projects simultaneously for the successful implementation of the system.
Road Lighting Management System FeatureBy utilizing various IT technologies, we provide optimized services based on system linkages and multiple experiences.
Computerized Management SystemReplaces multiple colon management with computerization of history management
Configure Separate screen by person in chargeProvide differentiated services for managers /complainants/ maintenance companies
Mobile applicationProvides mobile applications considering the characteristics of frequent on-site work
Trouble Report System ImprovementProviding non-stop service of failure report using IT technology
Provide the latest mapProvide the latest maps through the linkage of the GIS Geographic Information System
Bill ManagementProvide electricity bill status and various statistical analysis data through linkage with BillKorea
Local governments Status
Seoul City | Seocho-gu, Seongdong-gu, Guro-gu, Dongjak-gu, Geumcheon-gu, Gangbuk-gu, Dobong-gu, Gangseo-gu, Yangcheon-gu, Yeongdeungpo-gu, Seongbuk-gu |
Gyeonggi-do | Gwacheon, Uiwang, Suwon 4 District Offices, Gimpo-gun, Yangpyeong, Yeoju-si, Ansan-si 2 District Office, Gapyeong-gun, Gunpo-si, Goyang-si, Gwacheon-si |
Incheon | Ganghwa-gun (14 towns), Ongjin-gun 2 Districts |
Gangwon-do | Wonju-si, Samcheok-si, Yangyang-gun, Yeongwol-gun |
Chungcheong | Daejeon Dong-guㆍSeo-guㆍDaedeok-guㆍJung-gu, Boryeong-si, Buyeo-gun, Gyeryong-si, Seosan-si, Asan-si, Sejong-si, Geumsan-gun, Dangjin-si |
Jeolla | Jeonju 2 District Office, Gwangju Gwangsan-gu, Gwangju Buk-gu, Gwangju Nam-gu, Gwangju Dong-gu, Goheung-gun, Muan-gun, Damyang-gun, Gokseong-gun, Yeonggwang-gun |
Gyeongsang | Busan Suyeong-gu, Busan Gijang-gun, Busan Geumjeong-gu, Busan Dongnae-gu, Busan Buk-gu, Busan Gangseo-gu, Ulsan Nam-gu, Daegu Buk-gu, Daegu Nam-gu, Daegu Dalseo-gu, Gumi, Gyeongju, Yeongcheon, Jinju, Hamyang-gun, Masan Member District, Changwon-si, Masan Happo-gu, Tongyeong-si, Uiryeong-gun, Miryang-si |
System configuration
Manager ScreenIn the manager screen, all rights to the program are granted, and various services are provided to replace the existing handbook.
Complaint Management| Receipt and Confirmation of Failure Report – Work Order – Approval of Repair
History management| New / Relocated / Abolish Management and Various Statistics
Material management| Material receipt and release, inventory management, lamp life management, etc.
Manage other settings
Maintenance Company screenThis screen is provided to the registered companies in the manager screen, and the manager checks the work order after reporting the failure of the complaint, and it is configured to check the work order contents and register the processing details.
Complainant screenThe complaint screen is configured so that you can simply input the report of the breakdown of the road lights without registering, and you can check the processing result.
How to report the troubleThe QR code or NFC tag on the label is used to move to the trouble report screen. Simply enter the details of the trouble and the trouble report is received, real-time inquiry is made on the manager screen.